Safe Work Method Statement

Metal roof replacement, 14 Example St, Ipswich QLD

SAMPLE

Before you use this SWMS

Cleared for Site prepared this SWMS from information supplied by Example Roofing. Example Roofing, as the business doing the work, is responsible for it. Before high-risk work starts, you must:

  • check it matches the actual site, task and conditions, and correct anything that doesn't;
  • go through it with every worker doing the work, and update it with their input;
  • sign it, and give a copy to the principal contractor;
  • follow it, and stop work and review it if the work, site or controls change.

It does not replace competent supervision or advice from a qualified safety professional where the work needs it.

Document details

Business (PCBU)Example Roofing, ABN 00 000 000 000
ContactDan Morgan, 0400 000 000, dan@example.com.au
Site address14 Example St, Ipswich QLD 4305
Principal contractorExample Builders
Work activityStrip existing tiled roof, replace battens, install new Colorbond roof sheeting, gutters and downpipes
Roof detailsSingle storey, about 3.5 m to gutter, about 22 degree pitch, about 180 m²
Start dateThursday 5 November
Responsible for implementing and reviewingDan Morgan, owner and supervisor
Version1.0, given to principal contractor before work starts

High-risk construction work on this job

Job steps, hazards and controls

Risk before and after controls: H high, M medium, L low.

#Job stepHazardsBeforeControlsHow it's checkedWhoAfter
1Arrive, induction, site checkOverhead service line at the front; solar panels; people belowHSite induction. Energex to isolate and shroud the service line. Solar shut down and isolated by a licensed electrician. Check roof framing for rot.Toolbox talk on this SWMS. Isolations confirmed in writing before anyone goes up.DanL
2Set up exclusion zoneFalling tiles, tools and debris hitting peopleHBarricade and sign the drop zone. Driveway closed to the owner while stripping. Skip directly below the work area.Checked each morning and after any change.DanL
3Edge protection and accessFalls from the roof edge or ladderHPerimeter scaffold installed by a licensed scaffolder before work starts. Access by stair tower.Scaffold handover certificate and green tag checked before use, and after wind or rain.Scaffolder, DanL
4Strip tiles and battensFalling through the frame; cuts; manual handling; dustHStrip in sections so workers stay on framing. Harness clipped to a rated anchor where the frame is open. Gloves and long sleeves. Tiles passed down by hoist, not thrown.Harness and anchors inspected before use. Rescue plan covered at the toolbox talk.All workersM
5Install battens and safety meshFalls between battens; sharp mesh endsHSafety mesh fixed and tensioned before sheeting.Dan checks mesh before sheets go on.All workersL
6Crane-lift and lay sheetsSheets catching wind; struck by load; strainHCrane truck with licensed operator and dogman. No one under the load. Stop sheeting in gusts over 40 km/h. Two people per long sheet.Wind forecast checked each morning; Dan calls a stop when needed.All workers, crane crewM
7Cut, drill and fixHot swarf; noise; eye injuriesMShears and nibblers, not grinders. Glasses and hearing protection. Tested and tagged tools on RCD power.Visual tool check before use.All workersL
8Gutters, fascia, flashingsFalls when reaching past the edgeHWork from the scaffold platform only. No ladders against the gutter line.Edge protection stays until final fix.All workersL
9Heat and weatherHeat stress; wet sheets; stormsMStart at 6am, shade breaks, water on site. No roof work in rain or on wet sheets.Forecast checked daily.DanL

PPE, plant and licences

PPESoft-soled safety boots, long-sleeve hi-vis shirt, wide-brim hat, gloves, glasses, sunscreen. Harness and lanyard where fall arrest is used. Hearing protection when cutting.
Plant and equipmentPerimeter scaffold, crane truck, tile hoist, safety mesh, power tools on RCD
Licences and ticketsWhite card for everyone. Scaffolding, crane and dogging high risk work licences for those tasks. Working-at-heights training for harness users.

Emergency

First aidKit in the ute. First aider: Dan Morgan
Nearest hospitalIpswich Hospital, Chelmsford Ave, Ipswich
Fall from heightDon't move the person unless they're in danger. Call 000. Tell the principal contractor.
Suspended in a harnessStart the rescue plan straight away; suspension can cause harm within minutes. Call 000 if rescue isn't immediate.
Notifiable incidentPreserve the site and notify Workplace Health and Safety Queensland on 1300 362 128.

Review

Reviewed when the work or site changes, when a control isn't working, or after any incident. If work isn't being done as this SWMS says, stop until it is.

Worker sign-on

I confirm this SWMS was explained to me, I understand it, and I'll follow it. I'll stop and tell my supervisor if I can't.

NameLicence or ticketSignatureDate
Dan MorganWhite card
Jordan PikeWhite card